HOW THE T-LOCK SYSTEM WORKS
Get consistently level, evenly spaced tile with a simple system designed for professional installation.
What You Need
Three simple components work together to create a level, consistent tile installation.
-
T-Lock Clips
View ClipsCreates consistent spacing while providing the connection point for the levelling wedge.
-
T-Lock Wedges
View WedgesReusable wedges apply even pressure between adjoining tiles during installation.
-
Base Plates
View Base PlatesHelps protect delicate tile surfaces and can also be used as a shim or spacer.
STEP 01 — Prepare the Tile
Spread the adhesive according to the manufacturer’s instructions.Remove the excess mortar from the edges using a trowel.
STEP 02 — Position the Clips
Insert a T-LOCK clip underneath the tile. According to your tile size, set one or more T-LOCK clips per side.
STEP 03 — Set the Adjacent Tile
Install the adjacent tile ensuring proper bondage by firmly pressing in place.
STEP 04 — Insert & Tighten
Insert a Wedge into the clip until you feel resistance
Tighten, to ensure there is no variation in height of adjoining tiles.
STEP 05 — Removal of Clip
After 24hrs strike the sides of the clips with a rubber mallet or safety shoes parallel to the grout line.